This was the first time I have ever attempted to build my own bathroom, including the shower stall (11 bags of cement total!),
all tile work, installing everything. I learned a lot.
Basic rough framing done by builder to my specs |
|
Step 1: making sloped cement flooring for stall |
|
1/4 inch per foot slope. Cement has mesh reinf in it |
Step 2: While cement cures for 24r hrs, cut liner |
|
Liner goes in-between cement layer to ensure water goes into drain |
Step 3:Glue liner to size. 2 pieces into 1 big one |
|
cut hole for drain, make sure enough for wall coverage and door sill coverage |
|